This project is related to the students’ studio design project in the previous semester. Students are expected to demonstrate their understanding of building services by proposing and designing the most appropriate systems for the building which include:
i) electrical supply system (including simple air-conditioning system)
ii) cold water and hot water supply system
iii) sewerage and sanitary system
iv) drainage system.
Therefore students are required to produce appropriate drawings and diagrams which include specifications, symbols, legends, images, etc. to describe the installation of all the building services.
Tsu Tsen Teh
Tuesday, 26 November 2013
Saturday, 19 October 2013
Saturday, 5 October 2013
Subscribe to:
Posts (Atom)